-
CNC Router Cut Okume Plywood Panels for
Main Hull and Outrigger
-
Spruce Spars for Gunwales and
crossbeams
-
All the Necessary Stainless Steel Hardware for
Detachable Crossbeams
-
Fiberglass tape
-
Fiberglass Cloth
-
1.25 Gallons of West System Epoxy
with 206 hardener
-
Wood dust Epoxy Thickeners
-
Deck Plates (2)
-
Outrigger Drain Plug
-
Copper Wire
-
Prefabricated Aluminum Rudder
Cross bar
-
Carbon spar for rudder assembly
-
Carbon Tubing for rudder assembly
-
Prefabricated stainless steel
cables with ferrules at ends
-
Hinges and Prefabricated aluminum
pedal plates necessary for pedal assembly
-
Complete Step by Step Manual with
pictures of the building process